首页 文档
Recent Blogs
Mermaid Gantt Chart Practical Guide: Project Management Workflow from Syntax Analysis to Enterprise ApplicationsPDCA Cycle-Driven Biweekly Review: Efficient Work Planning and Task Breakdown MethodologySystematic Application and Efficiency Improvement Practice of PDCA Cycle in Biweekly ReviewsPDCA Cycle-Driven Biweekly Review: Building an Efficient Work Planning Management SystemEffective Application of PDCA Cycle in Biweekly Reviews: Building a Systematic Work Planning Management SystemPDCA Cycle-Driven Biweekly Review: Building an Efficient Work Plan Implementation SystemScientific Decomposition of Personal OKR Goals: Comprehensive Application of WBS TechnologyScientifically Decomposing Personal OKR Goals: A Comprehensive Guide to WBS Technique Application
Manufacturing Smartly Utilizes EOQ Model to Solve Inventory Challenges

Economic Order Quantity and Manufacturing Inventory Management: How Manufacturers Use the EOQ Model to Solve Inventory Challenges

Have you ever wondered why manufacturing giants can precisely control their inventory, avoiding both capital blockage and stockouts? Last week, a procurement manager from an appliance factory suddenly asked me: "We replenish compressors every month—how many orders should we place each time to save costs?" This question has actually been solved by the EOQ model long ago! This century-old algorithm remains the golden rule for inventory optimization.

What is Economic Order Quantity?

The Economic Order Quantity (EOQ) is essentially about doing one thing: calculating the balance between ordering frequency and storage cost. It's like buying coffee—if you buy half a year’s supply at once, you save on delivery fees, but it might go stale in storage. EOQ helps you find that "just right" sweet spot that minimizes total costs. It differs from JIT (Just-In-Time) systems: the former suits stable-demand standard components, while the latter leans toward order-based production like Toyota’s model.

Three Common Misunderstandings About EOQ Model Application in Real Factory Practice

Misunderstanding 1: Just Plug Numbers into the Formula

Last year I helped optimize inventory for an auto parts factory in Jiangsu. The owner pulled out a calculator and directly plugged numbers into the formula: "Annual demand 100,000, ordering cost 800, holding cost 15"—the result was 1,333 units. But when he tried to execute it, the workshop supervisor shot back: "Molds can’t be changed unless production runs start at 2,000 units!" What does this say? Real-world constraints are far more complex than math problems!

Misunderstanding 2: Costs Are Estimated Randomly

A procurement manager at an electronics factory set the S value at 300, only to later discover he had overlooked quality inspection labor costs! The correct scientific method breaks it down like this:
  • S includes: purchase order processing costs (e.g., ERP system operation hours)
  • Warehouse staff + equipment depreciation allocation
  • Logistics scheduling fees (including fuel/tolls)
  • Inspection equipment wear-and-tear costs

Misunderstanding 3: Parameters Never Get Updated

A medical device company in Shenzhen calculated EOQ using data from three years ago, unaware that rising interest rates increased H values by 30%! I recommend setting up a review mechanism like this:
  1. Review warehouse fee unit prices quarterly
  2. Re-calculate funding costs every six months
  3. Immediately update the S value when production line changeover time shortens by 20%

Real Case: Air Conditioner Compressor Plant Achieves Inventory Optimization

Last summer during a visit to an air conditioner factory in Foshan, they showed me some impressive data changes:

Indicator Before Optimization After Optimization
Warehouse Space Utilization 68% 89%
Annual Purchase Frequency 45 times 22 times
Total Inventory Cost ¥3.2 million ¥2.15 million

How did they do it? Here are the three key strategies:

  1. Calculate EOQ separately for raw materials and semi-finished products
  2. Establish dynamic safety stock for core components (e.g., compressor safety stock reduced from 15 days to 7 days)
  3. Joint procurement of heat sinks and motor components to halve transportation costs

Honestly, many companies still rely on experience-based replenishment, not realizing that tools like Ganttable can visually integrate EOQ results into production planning. Imagine seeing optimal batch sizes represented directly on your Gantt chart—doesn't scheduling become much easier then?

By now, you might be wondering: "But what about seasonal products?" For example, space heater demand surges in winter—the extended version of EOQ comes into play there. But that’s another story. We’ll talk more next time! Have you faced any inventory challenges lately? Let’s discuss in the comments!